Cappa Construction & Maintenance completed structural strengthening works for one of our largest clients at Western Sydney Airport, performing carbon fibre reinforcement to existing concrete pits.
Sika CarboDur S1012 was installed on both internal and external faces of the pit wall. Adhesion testing was also completed by a NACE-2 certified inspector to ensure the product was structurally sound.