Cappa CM was engaged by a local council to complete a comprehensive repair of prospect creek stormwater channel. The scope of work involved a combination of panel replacement, concrete repair and crack injection to the bottom and side panels of the channel. As the repairs took place whilst there was live flow of stormwater in the channel, formwork and water pumps were used to redirect water from the repair areas in order to allow works to continue.
Cappa CM completed all works in-house, including excavation work and concrete panel remediation.