Cappa were engaged by Duratec Australia to assist them completing repairs to the O’Connor Reservoir tank in Canberra. The project ran over 7-months with the team completing Hypalon bandage works and Polyurethane crack injection repair.
The team were required to operate and work off two EWPs in order to reach certain areas of the water tank. Attention to detail and care were required throughout this project for the tank to pass rigorous leak testing at project completion.