Cappa completed a concrete pour on the roof of a 45-story high ANZ building located in Sydney’s CBD, installing concrete plinths for the cranes to fix to. Cappa completed the necessary formwork and steel installation, and subsequently completing concrete pours on the rooftop. The challenge with this project was getting the concrete from the ground level all the way to the 45th story. The team used a rotation of concrete kibbles, filling each from the Minicrete truck before wheeling them up to the service lift, up to the 4rd story, and then craning them the remaining two levels up. Key features include: