Cappa Construction & Maintenance was engaged by McConnell Dowell to carry out crack repairs on pre- fabricated concrete wharves.
The repairs were completed using a polyurethane (PU) crack injection method on the underside of the panels. Cappa completed over 200 metres of crack repair. Due to the location of the cracks, works were undertaken using an under-bridge unit and a via a boat on the water. Cappa C&M also had to work around tide times to gain access to certain areas.




