Cappa were engaged by Rhomberg Sersa to assist with the walkway installation project on the Hawkesbury River Rail Bridge. The walkway stretches all eight spans of the bridge and involves using a mobile gantry crane to lift the walkway modules and legs from boats in the water below to the brideg itself. Cappa assisted Rhomberg with the: