Cappa CM was engaged by Rhomberg Sersa to assist in installing walkways on the downside of each of the eight steel spans of the Hawkesbury River Bridge.
The scope of work included:
Cappa C&M provided the vessels and Coxswain-NC3 for the project
Assisting with installation of grating
Assisting with installation of galvanized troughing
Assisting with installation of full-width refuges to replace existing structures
Cappa C&M provided the vessels and Coxswain-NC3 for the project
Installation was undertaken in a live rail and heritage- sensitive environment.
Project took place over a 12-month timeframe.