Cappa Construction and Maintenance was contracted to carry out an inspection and repair on a pair of 10-metre structural columns at the UNSW Kensington campus.
The inspections required the use of an EWP to access the full height of the columns in order to evaluate the state of the concrete, while adhering to the strict safety and public access requirements of the university.