Cappa completed water ingress works along with concrete crack repair injection works to sections of the tunnel network below Sydney’s city circle St James route. This took place via possession and non- possession shifts, with Cappa utilising both dayshift, nightshift teams to work within the client time constraints.
Works completed included: Drip shield installation and polyurethane (PU) crack injection repair works in order to address water ingress in the tunnel.




