Cappa CM was engaged by a client to complete steel repair of a rail bridge, the scope of work involved needle gunning of rust and hand prepping for protective paint layers. Cappa CM took all the necessary steps to ensure the repair works didn’t interfere with the operation of the railway, as there pairs took place during the live flow of trains over the bridge.